Fire Code Refrom Centre (Project 6) This Report, Fire Safety in Shopping Centres - Effect of Combustible Construction on Fire Safety in Shopping Centres, is a guide for the specific fire engineerin

06.2021 Report

Fire Code Reform Centre (Project 6) This report, Fire Safety in Shopping Centres, identifies significant opportunities for greater efficiency and flexibility in the design and operation of fire pro

06.2021 Report

Fire Code Reform Centre (Project 4) This Technical Report, A Stochastic Model for CO Toxicity in Building Fires, involves the development of a Fundamental Model, incorporating engineering, risk-ass

06.2021 Report

Fire Code Reform Centre (Project 4) This Technical Report, The Effects of Sleep Inertia on Decision-Making Performance, involved with the development of a Fundamental Model, incorporating engineeri

06.2021 Report

This report was prepared for the ABCB by the consultant Philip Chun and Associates.

06.2021 Report

This report provides commentary on the cost implications of the proposed Deemed-to-Satisfy provision for the requirement of covered balconies to be sprinkler protected.

06.2021 Report

Fire Code Reform Centre (Project 3) This report, Fire Resistance and Non-Combustibility – Evaluation of Non-Combustibility Requirements examines the basis of existing requirements for non-combustib

06.2021 Report

Fire Code Reform Centre (Project 2) This Technical Report, Recent Approaches to Regulating the Fire Performance of Materials In Buildings, deals specifically with a review of existing approaches to

06.2021 Report

Fire Code Reform Centre (Project 6) This Technical Report, Review of Fire Safety in Shopping Centres: The Key Issues, is a report that describes the Project 6 studies and the outcomes in a concise

06.2021 Report

Fire Code Reform Centre (Project 4) This Technical Report, Arousal from Sleep with a Smoke Detector in Children and Adults, involved the development of a Fundamental Model, incorporating engineerin

06.2021 Report

This report provides the data derived from research conducted on the spatial dimensions for occupied manual and powered wheelchairs in Australia.

06.2021 Report

Consultation Report This report documents, in summary form, stakeholder feedback on the Accessible Housing Options Paper.

06.2021 Report

This report provides commentary on the cost implications of a range of proposed Deemed-to-Satisfy provisions emanating from the Emergency Egress for all Occupants Project.

06.2021 Report

This paper investigates whether the current Australian Nationwide House Energy Rating Scheme encourages heat stress resistance. Submitted as part of the ABCB Scholarship Research Program.

06.2021 Report

Fire Code Reform Centre (Project 1) This Final Report on the Restructure of BCA-90 Fire Provisions, Volume Two was undertaken to provide BCA fire provisions, restructured as detailed in the accompa

06.2021 Report

Fire Code Reform Centre (Project 4) This Technical Report, Flashover Fires - An Experimental Program, involved the development of a Fundamental Model, incorporating engineering, risk-assessment met

06.2021 Report

Fire Code Reform Centre (Project 4) This Technical Report, Selected Literature Reviews on Human Behaviour in Fire, involved the development of a Fundamental Model, incorporating engineering, risk-a

06.2021 Report

This paper was submitted by the ABCB to the Water Supply and Drainage Symposium hosted by the International Council for Research and Innovation in Building and Construction (CIB) in September 2019.

06.2021 Report

This paper investigates the development of solutions for Building Optimisation Problems (BOPs).

06.2021 Report

This report provides information about deaths reported to an Australian State or Territory between 01/01/2001 and 31/12/2013, where the person died as a result of scalding caused by water sourced f

06.2021 Report

The National Model Code of Conduct for Building Surveyors sets out minimum obligations for registered building surveyors undertaking statutory functions. It covers four areas:

06.2021 Report